Exposition Light Rail Phase II
The Exposition Corridor Transit Project Phase II is an extension of the phase one project currently under construction and will extend approximately seven miles from Venice Blvd. in Culver City to Colorado Ave. in Santa Monica. The goal of the project is to improve transportation mobility and connectivity for residents and commuters in the project study area; provide faster, more reliable transportation services; increase the capacity of the system and provide more travel choices.
Description of Role:
As sub-consultant to Parsons Brinckerhoff, BA Inc is tasked with discovery research to identify utility groups and obtain records and documents relative to as-builts and substructures; conducting field surveys to verify all existing underground and overhead facilities; and providing support to the design team in preparation of the utility drawings for existing facilities and proposed relocations. This role requires extensive interaction with utility companies and local agencies including but not limited to: Santa Monica DPW, LADWP, LADOT, Time Warner, Sprint, AT&T, Verizon, and Qwest, Level 3.
Agency/Owner:
Los Angeles County Metropolitan Transportation Authority
Location:
Los Angeles, CA
Project Amount:
$700,000,000
Project Completed:
2014
Prime Contractor:
Parsons Brinckerhoff / Skanska
BA’s Role:
Utility Engineering (and relocation)
Third-party Coordination
Drainage Design