Metro Purple Line Subway Extension – Section 1


Photo From commons.wikimedia.org

Photo From commons.wikimedia.org

The Purple Line Extension Transit Project is being built in 3 sections. When finished, the extension will provide a high-capacity, high speed, dependable alternative for commuters to travel between downtown Los Angeles and the Westside in about 25 minutes.

Section 1 of the Purple Line Extension Transit Project will add three new stations and 3.92 miles of new rail to Metro’s Rail system. The three new stations will be located at Wilshire/La Brea, Wilshire/Fairfax, and Wilshire/La Cienega. The project will extend the current Purple Line from Koreatown through Miracle Mile and is expected to begin operations in 2023.

The Purple Line Extension will continue from the current Purple Line terminus at the Wilshire/Western Station, extending westward for nearly nine miles along Wilshire Bl. Forty-nine thousand people are projected to board the train daily at the seven new stations.

Description of Role:

As a subconsultant, BA provided Engineering Design services for the first section of the overall extension project. 

  • Prepared construction bid documents including specifications, scope of work, estimates and plans for advanced utility relocations (AURs) and design-build packages. 

  • Responded to construction RFIs relating to utility relocations.

  • Performed plan review for third party utility relocations.

Agency/Owner:

Los Angeles County Metropolitan Transportation Authority


Location:

Los Angeles, CA


Project Amount:

$9,300,000,000 (All Three Sections)


Project Completed:

Anticipated Completion Date: 2023


BA’s Role:

  • Utility Relocation Design Consultant for Sewer, Storm Drain, Water, and Telecommunications

  • Fire Hydrant Relocation Design

  • Hydrology Report