Southwest Yard MP Design Build – Division 16
The Southwestern Yard Maintenance Facility is a consolidated maintenance facility that will serve both the Crenshaw/LAX Line and the Metro Green Line. The facility was designed, constructed and equipped to perform service and inspection, heavy repairs, blow-down, body repairs, painting, storage, cleaning and washing of light rail vehicles (LRV) in the Metro fleet.
Description of Role:
BA was tasked with As-built collection by reviewing all conceptual drawings and as-built information available as part of the RFP, contacting utility owners, and requesting existing record drawings. BA also assisted in the collection of pothole data in the areas that required additional investigation. Once collected, BA used this information to aid in the design of the fire service, domestic water, storm drain, and sewer facilities on-site. BA designed the storm drain system by implementing Best Management Practices (BMP) to adhere to the Low Impact Development (LID) design requirements of the City of Los Angeles.
Project Highlights
Design relocation and improvements
Providing Hydraulic and Hydrology (H/H) Report
Technical Fire Service Plan
Agency/Owner:
Los Angeles County Metropolitan Transportation Authority
Location:
Los Angeles, CA
Project Amount:
$175,000,000
Project Completed:
2019
BA’s Role:
Drainage and Utility Design